Fabrication shop open · Mon–SatGSTIN 27ADVPC1772D1ZJ
Arsh Engineering logo Arsh EngineeringThinks Technically
Sheet 05 Quality assurance

Tested before it leaves.

A dedicated quality testing facility, managed by our quality controllers, ensures every point of our QA policy is implemented on every job.

01 / Pressure testing

Rated to
350 bar.

Our hydraulic testing set-up handles test pressures up to 350 bar, alongside pneumatic testing for vessels where hydro testing isn't suitable.

350
bar · Max hydro test
02 / QA policy
  • Q.1
    Inspect procured raw material
    Sourced from reliable vendors and checked on assorted quality parameters before fabrication.
  • Q.2
    Stage-wise inspection
    Regular checks at every stage of manufacturing by skilled quality experts.
  • Q.3
    Final testing
    Finished equipment is tested before it leaves our premises.
03 / Test regime

Five tests.
Every unit.

Our finalised range undergoes a series of tests to ensure flawless performance and high quality standards.

T.01

Pressure test

T.02

Leakage test

T.03

Chemical test

T.04

Corrosion test

T.05

Tolerance test

04 / Client satisfaction

Client-centric
by policy.

Our client-centric approach, ethical business policies and transparent strategies have earned us a broad client base. Timely delivery and competitive pricing have helped us serve clients across the nation.

Discuss your requirement
Start a project

Have a drawing?
We'll build it.

Share your process data sheet or GA drawing — our design team will respond with a fabrication proposal and quotation.

CALL THE WORKS+91 80438 92300
Send an enquiry